In the southwestern U.S. and numerous semiarid areas of the world, reclaimed water forms a key component of regional water sustainability planning. Integrated planning of potable water, wastewater and reclaimed/recycled water infrastructures is highly beneficial in regional water sustainability planning that can lead to economic efficiency and increased water system robustness and reliability. Scenario planning is a strategic planning method organizations use to make flexible long-term plans by providing a structured account of a range of possible future transformations. Scenario planning within this framework identifies key uncertainties with respect to future planning and assesses the potential impacts of these uncertainties. Scenario planning for integrated water systems can identify infrastructure elements that are needed over a range of future conditions related to community growth, access to water sources, and public acceptance/rejection of indirect or direct potable reuse of reclaimed/recycled wastewater. Elements common to multiple futures can then be constructed to reduce the likelihood of overbuilding or under-building due to limited knowledge of anticipated future conditions. The primary elements of scenario planning include (i) identifying a decision or focal issue, (ii) identifying forces that drive critical decisions, (iii) ranking key forces by their degree of importance and level of uncertainty, (iv) identifying the most critical uncertainties, (v) building a set of scenarios (futures), (vi) describing the scenarios, (vii) creating scenario paths, and (viii) finding shared elements amongst scenarios. All are briefly described as is the application of the first five steps of the scenario planning procedure within a largely undeveloped (green-field) area situated in southern Pima County and southeastern Tucson, AZ. Limitations of scenario planning and generalizations that can be derived from the case study are discussed.

Original languageEnglish (US)
Title of host publicationWorld Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress
Pages2838-2845
Number of pages8
DOIs
StatePublished - 2012
EventWorld Environmental and Water Resources Congress 2012: Crossing Boundaries - Albuquerque, NM, United States
Duration: May 20 2012May 24 2012

Other

OtherWorld Environmental and Water Resources Congress 2012: Crossing Boundaries
CountryUnited States
CityAlbuquerque, NM
Period5/20/125/24/12

Fingerprint

water supply
infrastructure
water
planning
sustainability
planning method
wastewater
ranking
drinking water
economics

ASJC Scopus subject areas

  • Water Science and Technology

Cite this

Woods, G. J., Ormerod, K. J., Bailey, C. J., Kang, D., Quintanar, D. R., Curley, E. F., ... Arnold, R. G. (2012). Scenario planning for robust water supply infrastructure design. In World Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress (pp. 2838-2845) https://doi.org/10.1061/9780784412312.285

Scenario planning for robust water supply infrastructure design. / Woods, Gwendolyn J.; Ormerod, Kerri Jean; Bailey, Christopher J.; Kang, Doosun; Quintanar, Daniel R.; Curley, Edward F.; Lansey, Kevin E; Scott, Christopher A; Arnold, Robert G.

World Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress. 2012. p. 2838-2845.

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Woods, GJ, Ormerod, KJ, Bailey, CJ, Kang, D, Quintanar, DR, Curley, EF, Lansey, KE, Scott, CA & Arnold, RG 2012, Scenario planning for robust water supply infrastructure design. in World Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress. pp. 2838-2845, World Environmental and Water Resources Congress 2012: Crossing Boundaries, Albuquerque, NM, United States, 5/20/12. https://doi.org/10.1061/9780784412312.285
Woods GJ, Ormerod KJ, Bailey CJ, Kang D, Quintanar DR, Curley EF et al. Scenario planning for robust water supply infrastructure design. In World Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress. 2012. p. 2838-2845 https://doi.org/10.1061/9780784412312.285
Woods, Gwendolyn J. ; Ormerod, Kerri Jean ; Bailey, Christopher J. ; Kang, Doosun ; Quintanar, Daniel R. ; Curley, Edward F. ; Lansey, Kevin E ; Scott, Christopher A ; Arnold, Robert G. / Scenario planning for robust water supply infrastructure design. World Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress. 2012. pp. 2838-2845
@inproceedings{5897bdf560cd4e24a8df6dbbc801ebec,
title = "Scenario planning for robust water supply infrastructure design",
abstract = "In the southwestern U.S. and numerous semiarid areas of the world, reclaimed water forms a key component of regional water sustainability planning. Integrated planning of potable water, wastewater and reclaimed/recycled water infrastructures is highly beneficial in regional water sustainability planning that can lead to economic efficiency and increased water system robustness and reliability. Scenario planning is a strategic planning method organizations use to make flexible long-term plans by providing a structured account of a range of possible future transformations. Scenario planning within this framework identifies key uncertainties with respect to future planning and assesses the potential impacts of these uncertainties. Scenario planning for integrated water systems can identify infrastructure elements that are needed over a range of future conditions related to community growth, access to water sources, and public acceptance/rejection of indirect or direct potable reuse of reclaimed/recycled wastewater. Elements common to multiple futures can then be constructed to reduce the likelihood of overbuilding or under-building due to limited knowledge of anticipated future conditions. The primary elements of scenario planning include (i) identifying a decision or focal issue, (ii) identifying forces that drive critical decisions, (iii) ranking key forces by their degree of importance and level of uncertainty, (iv) identifying the most critical uncertainties, (v) building a set of scenarios (futures), (vi) describing the scenarios, (vii) creating scenario paths, and (viii) finding shared elements amongst scenarios. All are briefly described as is the application of the first five steps of the scenario planning procedure within a largely undeveloped (green-field) area situated in southern Pima County and southeastern Tucson, AZ. Limitations of scenario planning and generalizations that can be derived from the case study are discussed.",
author = "Woods, {Gwendolyn J.} and Ormerod, {Kerri Jean} and Bailey, {Christopher J.} and Doosun Kang and Quintanar, {Daniel R.} and Curley, {Edward F.} and Lansey, {Kevin E} and Scott, {Christopher A} and Arnold, {Robert G}",
year = "2012",
doi = "10.1061/9780784412312.285",
language = "English (US)",
isbn = "9780784412312",
pages = "2838--2845",
booktitle = "World Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress",

}

TY - GEN

T1 - Scenario planning for robust water supply infrastructure design

AU - Woods, Gwendolyn J.

AU - Ormerod, Kerri Jean

AU - Bailey, Christopher J.

AU - Kang, Doosun

AU - Quintanar, Daniel R.

AU - Curley, Edward F.

AU - Lansey, Kevin E

AU - Scott, Christopher A

AU - Arnold, Robert G

PY - 2012

Y1 - 2012

N2 - In the southwestern U.S. and numerous semiarid areas of the world, reclaimed water forms a key component of regional water sustainability planning. Integrated planning of potable water, wastewater and reclaimed/recycled water infrastructures is highly beneficial in regional water sustainability planning that can lead to economic efficiency and increased water system robustness and reliability. Scenario planning is a strategic planning method organizations use to make flexible long-term plans by providing a structured account of a range of possible future transformations. Scenario planning within this framework identifies key uncertainties with respect to future planning and assesses the potential impacts of these uncertainties. Scenario planning for integrated water systems can identify infrastructure elements that are needed over a range of future conditions related to community growth, access to water sources, and public acceptance/rejection of indirect or direct potable reuse of reclaimed/recycled wastewater. Elements common to multiple futures can then be constructed to reduce the likelihood of overbuilding or under-building due to limited knowledge of anticipated future conditions. The primary elements of scenario planning include (i) identifying a decision or focal issue, (ii) identifying forces that drive critical decisions, (iii) ranking key forces by their degree of importance and level of uncertainty, (iv) identifying the most critical uncertainties, (v) building a set of scenarios (futures), (vi) describing the scenarios, (vii) creating scenario paths, and (viii) finding shared elements amongst scenarios. All are briefly described as is the application of the first five steps of the scenario planning procedure within a largely undeveloped (green-field) area situated in southern Pima County and southeastern Tucson, AZ. Limitations of scenario planning and generalizations that can be derived from the case study are discussed.

AB - In the southwestern U.S. and numerous semiarid areas of the world, reclaimed water forms a key component of regional water sustainability planning. Integrated planning of potable water, wastewater and reclaimed/recycled water infrastructures is highly beneficial in regional water sustainability planning that can lead to economic efficiency and increased water system robustness and reliability. Scenario planning is a strategic planning method organizations use to make flexible long-term plans by providing a structured account of a range of possible future transformations. Scenario planning within this framework identifies key uncertainties with respect to future planning and assesses the potential impacts of these uncertainties. Scenario planning for integrated water systems can identify infrastructure elements that are needed over a range of future conditions related to community growth, access to water sources, and public acceptance/rejection of indirect or direct potable reuse of reclaimed/recycled wastewater. Elements common to multiple futures can then be constructed to reduce the likelihood of overbuilding or under-building due to limited knowledge of anticipated future conditions. The primary elements of scenario planning include (i) identifying a decision or focal issue, (ii) identifying forces that drive critical decisions, (iii) ranking key forces by their degree of importance and level of uncertainty, (iv) identifying the most critical uncertainties, (v) building a set of scenarios (futures), (vi) describing the scenarios, (vii) creating scenario paths, and (viii) finding shared elements amongst scenarios. All are briefly described as is the application of the first five steps of the scenario planning procedure within a largely undeveloped (green-field) area situated in southern Pima County and southeastern Tucson, AZ. Limitations of scenario planning and generalizations that can be derived from the case study are discussed.

UR - http://www.scopus.com/inward/record.url?scp=84866082204&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84866082204&partnerID=8YFLogxK

U2 - 10.1061/9780784412312.285

DO - 10.1061/9780784412312.285

M3 - Conference contribution

AN - SCOPUS:84866082204

SN - 9780784412312

SP - 2838

EP - 2845

BT - World Environmental and Water Resources Congress 2012: Crossing Boundaries, Proceedings of the 2012 Congress

ER -